Setting New Standards                                        

(817) 444 5310

Up
The Next Generation
*NEW* Cont. O-200
*New* 114 Series
Simple Installation
The "P" Model
EICAD
Customer Reports
Innovation
FAQ
Downloads
Customer Gallery
2007 Air Shows
Contact Us
Service Notes
Prices & Ordering
Simple Installation

E-MAG 3 Step Installation 

Estimated time - 2 to 4 hours

1   Install Drive Gear: 

  • Recover the non-impulse drive gear from your old mag and install it on your E-MAG. If you don't have a suitable drive gear, E-MAG can provide one.  

 

2 Connect Control Leads & Harness:  

  • Switch - Connect your existing ignition switch ("P Lead"). 

  • Power  - From your 12 volt power buss. 

  • Ground  - Connect  directly to engine case ground.

  • Tach - (optional)  

  • MAP  - Connect MAP sensor tube to fitting on ignition.

  • Spark Plugs and Harness Kit 

   

3  Install & Set Timing with Quick-Set TM: 

  • Pre-install the ignition(s) at any orientation that's convenient. You won't move them again so secure for operation.  Position the engine at TDC. 

  • Power the ignition ON.  Disconnect the MAP tubing where it ties into the craft and blow into it (minimum 1/2 psi for 1 second).  The built-in LED will flash RED.  Blow into the tube a second time and the LED will flash GREEN, indicating that timing has been set.  Power cycle the ignition and your done. 

Note: You can set timing on two E-MAGs in exactly the same way in exactly the same amount of time - 30 to 60 seconds.